Description
- Material: made of durable High-carbon stainless steel and plastic with brushed finish; Use electrostatic spraying technology to avoid rust, feel smooth and delicate, and reduce the friction with the suspension.
- Size: Original length: 30cm/11.8"; Extendable length: 51.7cm/20.2"; Diameter: outer rod -13.4mm/0.5", inner rod -10mm/0.4". Thickness is 0.5 mm/ 0.02 inch, each rod can bear 1.1 to 2.2 pounds, the friction of the wall and the extension of the rod will affect the use.
- Wide Application: These can be used as shower curtain rod, closet rod, curtain rod, coat hanger, shoe rack, or you can use them in the fridge to separate beverages and keep the cans or bottles from rolling around, etc.
- Easy to install: unscrew the inner rotating rod to required length, 3-5cm longer than actual shortest distance between two sides of objects, tilt the rod between two sides of objects slightly, make the rod parallel with floor gently, At this time, the tensions rod between the two walls is propped up by spring.
- Non- slip Design: There are non-slip rubber at both ends of the rod, which increases the friction with the wall surface, so that the rod is fixed more firmly and is not easy to fall off. The rod contains a thick spring, which is full of elasticity and gives the telescopic rod enough tension to hold firmly.
Product Detail: Original length: 30cm/11.8" Elongation: 51.7cm/20.2" Diameter: outer rod -13.4mm/0.5", inner rod -10mm/0.4" Color: white Package: includes 6 pack tension rods Features: Both ends of the skid resistant rubber increased the friction with the wall of the pole, more firm, not easy to fall off. The rod contains a thick spring, which is full of elasticity and gives the telescopic rod enough tension to hold firmly. Simple and practical, can do different kinds of DIY projects Istallation Method: 1. unscrew the inner rotating rod to required length in this direction 2. The length of the tensions rod must be 3-5cm longer than the actual distance 3. Press the tensions rod inward until it can be placed between the two walls and make it is parallel to the ground. At this time, the tensions rod between the two walls PS: At the time of installation, the third step of leveling is more laborious to illustrate that the pole is jammed. If you can move easily, it means that in the second step you need to extend some more length.